• 3 mins read
  • Published

EBRD sets €59m green finance launch in Tunisia

Amal Obeidi Editor Maghreb Insider

Post by Amal Obeidi

EBRD sets €59m green finance launch in Tunisia Maghreb Insider © maghrebinsider.com
EBRD sets €59m green finance launch in Tunisia © maghrebinsider.com

Tunisia's €59 million facility is scheduled to launch in Tunis on November 16. It will route financing through local institutions for business investment in efficiency and renewables, while also covering climate adaptation and circular-economy projects.

The facility will route funding through a maximum of six local financial institutions before it reaches small and medium-sized enterprises. The European Bank for Reconstruction and Development says loans to those institutions will be unsecured.

The launch ceremony is scheduled for November 16 in Tunis, from 9:00 a.m. to 1:30 p.m. The programme will present financing mechanisms and technical assistance. It will also cover incentives for businesses.

Funding will flow through local institutions

The €59 million facility is launching in cooperation with the European Union. In an October press release, the EBRD said the programme is the first of its kind in Tunisia and aims at "strengthening the competitiveness of the private sector and supporting the country's transition toward an environmentally sustainable economy."

Businesses are expected to receive financing for energy efficiency and renewable energy investments, as well as climate adaptation and circular-economy projects. The facility is also intended to support a currency fund that would offer Tunisian banks a foreign-exchange risk hedging mechanism at reduced rates, with EU support.

The programme sits alongside separate EBRD-backed investment in Tunisia's energy transition. In a project disclosure dated November 11, 2026, the bank outlined financing for the Scatec-Aeolus Tataouine 2 Solar project: a planned 100 MWAC photovoltaic plant and related transmission infrastructure. The EBRD describes Tunisia's power system as currently dominated by gas-fired plants and estimates that the solar project could reduce emissions by about 120,000 tonnes of CO₂ annually.

The Tataouine project has €33.7 million in EBRD financing within total project financing of €92.1 million. The bank also says it is seeking a grant of up to €3.25 million from the EU Neighbourhood Investment Platform for part of the transmission infrastructure. The EBRD classifies 100% of its financing for that project as green finance. Further details are set out in the EBRD project disclosure.

Officials set to present the programme

Participants are expected to include George Akhalkatsi, head of the EBRD office in Tunisia, and Mike Taylor, the Bank's director of financial institutions for the Middle East and Africa region. Emmanuel Amaral, head of the cooperation section at the European Union delegation to Tunisia, is also listed, alongside representatives from the Ministry of Industry, Mines and Energy.

The event agenda includes a panel on financing Tunisia's green transition and sessions on implementation and inclusive green finance. A signing ceremony with participating financial institutions is also planned. The focus on financing connects with wider infrastructure requirements discussed in a grid investment report on the Tunisia-Italy interconnector.

The EBRD puts the facility's value at €59 million, or about 200.9 million dinars.

Related Briefs