• 3 mins read
  • Published

Saied Calls for Procurement Law Review in Tunisia

Amal Obeidi Editor Maghreb Insider

Post by Amal Obeidi

Saied Calls for Procurement Law Review in Tunisia Maghreb Insider © maghrebinsider.com
Saied Calls for Procurement Law Review in Tunisia © maghrebinsider.com

Kais Saied says Tunisia's procurement rules no longer meet project deadlines or curb abuses, as he reviews unfinished roads and defects and discusses a bridge link between Djerba and the mainland.

The review covered national roads with mixed records: some remain unfinished, while others showed defects shortly after completion. President Kais Saïed met Salah Zouari, Tunisia's Minister of Equipment and Housing and acting minister responsible for Industry, Mines and Energy, in Tunis on 2 November to discuss infrastructure projects and public procurement rules.

Saïed called for a comprehensive revision of the procurement framework, saying the current regulations no longer meet the country's needs, particularly in the time required to complete projects and in preventing irregularities. He said the reform should extend beyond infrastructure to all sectors. Its aims were to improve transparency and curb abuses and corruption, while also accelerating project delivery. The request remained an announced reform intention; no draft law or implementing decision had been reported by 3 November. The presidency's account of the meeting was carried by Tunis Afrique Presse.

Road quality and access to Djerba

Among the projects discussed was the route linking Tunisia and Algeria, which the presidency described as nearing completion. Saïed also revived the proposal for a bridge connecting Djerba to the mainland, presented as an alternative to relying on the ferry service and the existing Roman road. The presidency said the project was intended to address daily travel difficulties. The bridge remains a proposal, distinct from current road works.

On 28 October, a section of Regional Road 117, known as the Roman Road and linking Djerba with Zarzis, was put into service after widening works near the Roman bridge in Médenine governorate, according to reporting on an announcement by Zouari. The road works were reported separately from the larger proposed bridge project.

A separate Libyan policy report covered ministry discussions on import rules and farm output, a different administrative issue from Tunisia's procurement review.

Rules and regional mobility

Saïed linked procurement reform to regional development, calling for an end to the isolation of several regions and better mobility for citizens. He also cited regional disparities and the failure to make full use of natural resources in different parts of Tunisia.

Saïed criticized lengthy project timelines and irregularities. His criticism also covered fraud and corruption allegations in some procedures. He pointed to roads that remained unfinished or developed serious defects soon after delivery, framing the proposed review as a nationwide reform rather than one limited to construction contracts.

Related Briefs